Fee Schedule

  • Animal License – $10.00/Lifetime
  • Assessment Search – $25.00
  • Building Permit – Evaluation based
  • Camping Fee – $30.00/night, $150.00/week, $400.00/month
  • Community Center – $120/day + $100 deposit Copies – $0.25
  • Electric – Commercial – $37 base + $0.117/kwh
  • Electric – Residential – $20 base + $0.117/kwh ($150 deposit)
  • Electric Yard Light – $8.50/month
  • Fax – $1.00
  • Garbage Bags – $3.00
  • Garbage Tags – $2.00
  • Garden Plot – $15.00
  • Gym Rental – $60/day + $200 deposit
  • Gym & Rooms Rental – $120.00/day + $200 deposit
  • NSF Checks – $30.00
  • Sewer Connection – $150.00
  • Sewer Rate – Commercial – $26.50/base + $6.60/1,000 gallons used
  • Sewer Rate – Residential – $26.50/base + $6.60/1,000 gallons used
  • Sewer/Sludge Dump – $35.00
  • Variance/CUP/Zoning Amendment Application – $225.00
  • Variance/CUP/Zoning Amendment Application – after the fact – $450.00
  • Water- Bulk – $25.00/base + $8.00/1,000 gallons
  • Water Connection – $150.00
  • Water Reconnection – $100.00
  • Water – Shut off/Turn on – $25.00/each
  • Water Rate – Commercial – $30.00/base + $6.60/1,000 gallons used
  • Water Rate – Residential – $30.00/base + $6.60/1,000 gallons used

Electric Service Rate Schedule

  • Electric – CIP – 1.50%
  • Electric – Commercial – $37.00 + $.117
  • Electric – Customer Requested Maintenance – Actual Cost plus Truck
  • Electric – Customer Outage problem on customer side – Actual cost plus truck
  • Electric – Demand Three Phase – $52.00/base + $.045 & $18.00 KW
  • Electric – Orange Disconnect Notice – $25.00
  • Electric – Residential – $20/base + $.117/kwh
  • Electric – Yard Light – $8.50/month
  • Electric – Deposit – $150.00
  • Electric – Reconnection – $100.00
  • Electric – Power Interrupter – $50.00
  • Electric – Truck – $80.00/hour
  • Electric – Labor – Regular – $60.00/hour
  • Electric – Labor – Overtime – $90.00/hour
  • Electric – New Service Connection – $100.00
  • Electric – Temporary Service Connection – Actual cost plus truck
  • Electric – Underground Single Phase – $5.00/foot
  • Electric – Underground 3 phase – $10.00/foot
  • Electric Meter Testing if found to be within 2% accurate – $40.00
  • Electric Meter Testing found outside of 2% accurate – No charge
  • Other services not identified will be determined at time of request/completion of work based on actual costs
  • 40% is added to the cost of merchandise to accommodate for time and labor to configure and order product for customer and system design.
  • * jobs under 500′ will be billed accordingly